The
safe working load must be selected according to each application.
Although the effort to move the crane bridge is small
it can be further reduced by selecting the lightest size/weight
of system to suit the application i.e for 400kg maximum
load normally select a 500kg capacity system and not 1000kg.
Available options: -
125kg, 250kg, 500kg, 1000kg, & 2000kg |
 |
Gantry
Track Length (GTL) is determined by the specific
area requiring lifting coverage.
Gantries have Support Centres upto a
maximum of 9m detremined by the system size selected and
your system requirements.
The option to choose your own support centres is offered
during the selection process. |
 |
 |
Crane
Bridge Span (CBS) is the distance between the
centres of the gantry tracks. The Crane Bridge
Length (CBL) is the overall length. Crane In
A Box offers crane bridge lengths upto 10m depending upon
system size. The Crane In A Box®
design provides a stansard crane bridge overhang of 300mm
on each end, beyond the gantry track. |
In
order to reduce the operation resistance to an absolute
minimum we recommend that the trolley Load Pin Height
(LPH) be kept to as low as possible with practical considerations
applied to minimum headroom requirements.
Height LPH is measured from the floor to the trolley load
pin from which a hoist / lifting device is suspended. |
 |